|
Products & Services
Jails On Demand
Jails On Demand offered for lease by DRC Logistics provide fast, affordable safe solutions to jail overcrowding. Sturdy steel modular structures used around the world for housing and logistics are customized for secure corrections use in compliance with standards set by the American Correctional Association (ACA). Units can be configured for multi-bed sleeping, dayroom, shower, or kitchen use. Custom floor plans are available. Quick delivery and setup; low maintenance.
For more information on Jails On Demand, call Charlie McNichol toll free at 888-721-4DRC or visit jailsondemand.com.
DRC International Work Camps
We deliver work camp and life support systems worldwide, specializing in rapid mobilization in remote locations and under emergency and post-disaster conditions. We work with a variety of clients - including oil, explosive ordinance disposal (EOD), construction firms, refugee and military forces - to design and implement systems that maximize productivity.
- Workforce Housing Design, Procurement, Construction Management
- Auxiliary Facilities - Dining, Medical, Recreation, Stores
- Portable Water, Communications, Power, A/C, Heating
- Catering, Laundry, Housekeeping
- Security
- Transportation & Logistics
MODULAR BUILDING AND CAMP CONTRACTS AND PROJECTS
Project Location: Baghdad, Iraq (Operation Iraqi Freedom)
Client: Coalition Provisional Authority/Ministry of Interior/C.B., LLC
Construction of temporary camp within Terminal D, Baghdad International Airport (formerly Saddam Hussein International Airport) for 150 personnel, both male and female, within 7 days including custom-built shower units, power generation, sleeping facilities, offices, MWR, and full service kitchen and cold storage.
Construction of 150 person permanent Greenfield Camp in BIAP, Baghdad, Iraq within 30 days of Notice to Proceed. Camp included interior hallway multi unit buildings for single or dual person occupancy bedrooms with individual baths; bunkhouse facilities for laborers, 500-man kitchen and dining facility with walk-in freezers and coolers; MWR facilities, laundry facilities, and offices.
Cost: $5,000,000 estimated
Project Location: Mogadishu, Somalia (Liberation of Somalia)
Client: NATO/United Nations/U.S. Navy/U.S. Department of State
Construction of multiple man-camps, large indoor dining and kitchen facilities for hundreds, large air conditioned individual bedrooms and baths, multiple MWR facilities, multiple laundry facilities, sewer, water, and power generation facilities for each. In addition, the emergency reconstruction of 38 massive buildings inside the US Embassy Compound and the University of Somalia, drilling of water wells, provision, maintenance, cleaning and servicing of 175 portable toilets (delivered by airlift). Also supplied catering, life support, pest control, laundry, MWR, travel, and banking facilities in this very desolate location.
Project Location: Kuwait and the Demilitarized Zone between Kuwait and Iraq.
Project Title: Desert Storm
Construction of 14 separate simultaneous permanent camps for up to 10,000 personnel. All cabins or renovated complexes constructed within 30-45 days of Notice to Proceed as required. Included full life support facilities, kitchens, dining rooms, laundry facilities, convenience stores, mechanical and service shops for trucks and equipment, power generation, sewer and water facilities, and security.
DRC also provided approximately 13,000 skilled laborers on a contract basis to extinguish oil fires set by Saddam Hussein, rebuild the school system, reconnect the 300KVA transmission power lines destroyed by fleeing Iraqi troops and coalition bombing, clean, demine and perform and perform UXO explosive ordnance and munitions recovery for 65 miles of beachfront trenches, several destroyed former Kuwaiti military bases occupied by Iraqi troops, thousands of square miles of dessert and major portions of Kuwait/Iraq demilitarized zone. Some camps operated for up to 4 years.
Project Location: Kosovo
Project Title: Kosovo Liberation
DRC provided camps, life support, logistics, overseas troops, helicopter hilltop standby rescue, recovery and observation facilities, medical employees, construction of barriers, roads, traffic intersections (including the first working traffic signal in post-war Kosovo); large 12,000 square meter, extra heavy stress, winter poured, concrete tank staging areas and truck refueling areas.
Shower and toilet facilities manned and operated 24 hours per day.
Project Location: Port-au-Prince, Haiti
Client: Fluor Corporation (US Department of State contract)
Construction and Operation in 2006-2007 of 350 man Greenfield work camp to support construction of United States Embassy in Haiti within 60 days of Notice to Proceed. Camp includes interior hallway multi unit buildings for single or dual person occupancy bedrooms with individual baths; bunkhouse facilities for laborers, 100 & 250-man kitchens and dining facilities with walk-in freezers and coolers; MWR facilities, laundry facilities, gymnasium, offices, two recreation rooms, and military-style PX. Operation includes provision of clean treated water from our on-site well, power generation and grid from two two-mg generators, waste water services, food services, and telecommunication, VOIP, and internet facilities.
Cost: $20,000,000 estimated
Progress Begins with DRC
DRC offers specialized services backed by experience since 1989. We are unequaled in our ability to rapidly deploy housing, manpower, supplies, and equipment, and to establish total life support work camps in the most remote locations and under the most difficult conditions. Progress begins with a call to DRC.
DRC Services
|